Earthquake - Chronicle of reconstruction projects

December 2015

The project Awasuka begins to act to strengthen Bhimphedi a house in the main street of the village.

After studying how to begin to act and what kind of reinforcement was the most suitable construction plans were the work of reform. The owners of the home, Manoj and his family have taken to fix the house because in a month's time will come and the winds had subjected half open house.

It has begun dismantled the roof and the top floor in a hurry and started reconstruction.

The team has Bhimphedi Awasuka in several meetings with neighbors and other experts working in the area to explain the prototype home that will also store and costumes. A meeting has been made with Yuliya, a Swiss geologist who has gone Bhimphedi to study the ground. They spoke about the strength of the field at each Ward (district) Bhimphedi because each area has different characteristics: the stony Bazzar is stable, while it rises as a more predominant clay.

We also have all the necessary documents and drawings for participants Desing Competition of Rural Housing contest NEA (National Engineering Association) that we have presented.

Also, a technical MRC, the Association of Healthy Kitchen, went to the center to see how we could build an outdoor kitchen and an example for the people, because it wants to implement a system for reducing healthy cooking Smoke occurs while cooking and is a serious problem in Nepal.

Image Gallery

  • Bhimphedi
  • Bhimphedi
  • Bhimphedi
  • Bhimphedi
  • Nuwakot
  • Kathmandu
  • Nuwakot
  • Nuwakot
  • Nuwakot
  • Nuwakot
  • CH Patan
  • siphal
  • Nuwakot
  • Manoj House Bhimphedi .January 2016

Go to: Content » | Go to header »| Main Nav »